In Day 4 of building a gunite pool, the gunite is sprayed into the pool to build the walls and floor.
In Day 4 of building a gunite pool, the gunite is sprayed into the pool to build the walls and floor.
In Day 3 of building a gunite pool, the rebar infrastructure is installed.
In Day 2 of building a gunite pool, plumbing and electrical chases are installed.