How To Build A Gunite Pool (Day 8)

Introduction

This is part 7 of a story that documents how to build a gunite pool. Click these links for Part 1, Part 2,  Part 3,  Part 4,  Part 5, or Part 6 of the story.

Day 8 – Preparing For The Concrete Deck

During day 8, the land around the pool is prepared for receiving the concrete deck.

The day starts out by outlining the concrete deck by spraying orange paint onto the compacted clay base. Gravel is brought to the site and spread around the perimeter of the pool. More compacting of the gravel into the clay is completed.

After completing the compacting, the concrete slab perimeter is constructed by hammering in 2×2 studs into the ground and connecting them with a flexible fiberboard. This will stay in place until after the concrete is poured and cured.


This slideshow requires JavaScript.


Upcoming In The Next Article

Day 9 – Pouring the concrete deck

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.